Client Name Group Name Owner Name Job No |
Description | Start Date | End Date | Gallery |
---|---|---|---|---|
Enter Engineering Pte. Ltd. Enter Engineering Pte. Ltd. Jizzakh Petroleum JV LLC 4057 |
Design, detailed engineering, procurement, fabrication, testing, ASME U stamping, painting / pickling and passivation and supply of Deaerator in SS304 and Feed Tank in SA 516 Gr 70 to ASME Sec VIII Div 1 for Methanol to Olefins Project | July 11, 2023 | ||
Star Tower And Parts Trading DMCC Star Tower And Parts Trading Ministry of Electricity & Water Kuwait 3276 |
Replacement of 3 Economiser Headers under R stamp. Procurement of materials, fabrication, hydro test, certification and delivery and site supervision and site certification in accordance with ASME Sec I for Combined Cycle Gas Turbine Plant at Sabiya Power Station of Kuwait Ministry of Electricity and Water for GE Power O&M. | February 19, 2020 | June 24, 2020 | |
CIR Sociedad Anonima, Uruguay CIR Administración Nacional de Combustibles, Alcoholes y Portland (ANCAP) 2385 |
Design appraisal, drawings, procurement, fabrication, testing, and Code Stamping (Part ‘S’ stamp) of 4 Nos. Water Wall Panels, 1 No. Mud Drum, 1 No. Steam Boiler Drum in accordance with ASME Sec I | October 16, 2017 | May 22, 2018 | Go to Gallery |
Elmrad Corporation, India Elmrad Corporation SASA Saudi Salt Automatic Refinery 1787 |
Design, detailed engineering, procurement, fabrication, testing, insulation and delivery of Feed Tank with Deaerator to ASME Sec VIII Div 1 for SASA Saudi Salt Automatic Refinery, Jeddah, Saudi Arabia. | May 24, 2013 | September 13, 2013 | Go to Gallery |
CIR Sociedad Anonima, Uruguay CIR Cousa 1709 |
Design, procurement, manufacture, testing and delivery of of Steam Drum (OD 1750 x 7200 T/T x 25 mm thk) and Water Wall Panels with partial ASME 'S' Stamp | December 12, 2012 | May 9, 2013 | Go to Gallery |
Areva Solar, USA Areva CS Energy Ltd 1458 |
Procurement, fabrication, NDT, Testing and Electroless Nickel Plating of SA 387 P22 Boiler Piping (Risers and Downcomers)to ASME Sec I for Cogan Creek Project, Australia | November 23, 2011 | August 25, 2012 | |
CIR Sociedad Anonima, Uruguay CIR Fanapel Uruguay 1220 |
Design, procurement, manufacture, testing and delivery of of Steam Drum (OD 1300 x 8300 T/T x 45 mm thk) and Water Wall Panels with partial ASME 'S' Stamp for 15 MW Power Plant at Juan Lacaze Paper Mill, Uruguay | July 29, 2010 | December 20, 2010 | Go to Gallery |